
Two new berths will appear in St. Petersburg by 2026, after which their number will reach 21. The cost of the facilities will be 35.5 million rubles. It is also reported that a new pier next to the Faberge Museum is being prepared for opening on the Fontanka River Embankment. Its construction cost 8.8 million rubles.
Photo: ru.freepik.com
In 2025, the Summer Pier in Kronstadt will start operating. The facility will be able to receive urban passenger ships. There will also be a specialized parking lot for detained small-sized water vehicles nearby. The cost of work on the opening of the Summer Pier will amount to 26.7 million rubles.
To date, there are 19 urban and about 50 private berths in St. Petersburg. New city marinas may open in the future near places popular among tourists, Vedomosti North-West reports.
Earlier we wrote that a low-rise residential complex for 30 billion rubles will appear near Peterhof.